Renovation started in April 2006
We moved all of our belongings into store so that work could begin on demolishing the inside of the old house, take out the staircase, remove the windows and roof ……….
A road was built across the field (at great cost) so that the crane and all the deliveries could be made more easily.

As a picture speaks a thousand words here is our story in photographs

Roof Removed

The Start of the Renovation



House with no roof but great views!

New Floors go in


New Window

Wooden Beams from Old Roof

Roof bream going up

Roof takes shape

Main Part of Room On

Internal Beams for " Indoor Balcony" go in

Rooms taking shape

Entrance Hall (was the barn doors)

Boiler Room Taking Shape

Boiler Room with Water Tanks

The Glass for the Panoramic Views

The Room with a View

Our Vision Taking Shape

Laying the balcony floor

The Kitchen begins - plasterboarders on site (at last)

The Dream Kitchen to be!

Cave Bedroom taking shape

Cave Bathroom

Cave Bedroom Taking Shape

Testing the bath for Top Floor Family Room

Top Floor Family Room taking Shape

Beautiful Roof Beams of Top Floor Bedroom

Original Old Beam from House reinstalled above balcony

Lounge/Dining Room

Excavation begins for Fosse Septique

The Most Expensive Fosse Septique ....

Chimney Finished

Underfloor Heating Pipes Go In

First Snow Arrives

Getting There
December 2008

Transformation nearly complete

Looking Good

Our Winter Mountain Views

Living our Dream
January 2008
Decoration completed and furniture delivered and installed.
Everything Ready for arrival of first guests ……………….

Bedroom 6

Bedroom 6 Bathroom

Bedroom 6 View 2

Cave Bedroom & Bathroom

Cave Bathroom

Cave Bedroom View 2

Dining Room

Kitchen

Entrance Hall

Bedroom 4

Lounge

Lounge View 2

Dining Room View 2
Le Fin ~ The End …………… or is it
October 2008 – The Finishing Touches
The outside of the chalet was in need of the finishing touches of an expert in the ancient art of crepi
Here is the photo story of the final transformation
BEFORE

Before the Crepi Work Begins

Scaffold goes back up to commence work again

Doors and Windows are enhanced

Stone Work is Revealed
![LE PASSEU NOV 2007 026[1] Stonework revealed at roadside elevation](http://alpineambiance.files.wordpress.com/2009/07/le-passeu-nov-2007-0261.jpg?w=300&h=225)
Stonework revealed at roadside elevation
![PB070002[1] PB070002[1]](http://alpineambiance.files.wordpress.com/2009/07/pb0700021.jpg?w=500&h=375)
![PB110005[1] The End](http://alpineambiance.files.wordpress.com/2009/07/pb1100051.jpg?w=500&h=375)
The End

Slate Porch Roof is repaired

Truly Finished!
Fabulous !
Hard work, but what a result – the chalet looks beautiful .
I lived in Switzerland for a year and just loved the snow and skiing -must go back again !